Liquid Waste & Botanical Treatment
Design, build, plumb, commission and maintain interior and exterior botanical cells that treat greywater and blackwater on site, reuse treated greywater to flush toilets, and pass conventional plumbing inspection while doing it.
What you'll be able to do
- Build an interior botanical cell from layout to planting
- Plumb greywater reuse to toilets and pass inspection
- Size and site an exterior cell for blackwater polishing
- Commission and maintain a living treatment system
Syllabus
6 parts · 19 lessons · 77 quiz questions · ≈3.2 hours of reading · sign in to open lessons
Part A SYSTEM, REGULATION AND SIZING
- 1 The Path of Liquid Waste Water 9 min · 4 q
- 2 Greywater Regulation 9 min · 4 q
- 3 Sizing the Cells 9 min · 4 q
Part B PLUMBING AND COMPONENTS
- 4 Drain Slope and Flow Velocity 10 min · 4 q
- 5 Interior Cell Components 9 min · 4 q
- 6 Exterior Cell Components 9 min · 4 q
Part C BUILDING THE CELL
- 7 Layout and Excavation 8 min · 4 q
- 8 Lining the Cell 9 min · 4 q
- 9 Reception Boxes 16 min · 5 q
- 10 Liner Penetrations and Observation Stems 11 min · 4 q
- 11 The Peat Moss Filter 8 min · 4 q
- 12 Filling the Planters 8 min · 4 q
Part D PUMPS, POWER AND MODULES
- 13 Submersible Pumps 10 min · 4 q
- 14 MRSPOM — Solar Power for the Recirculation Pump 10 min · 4 q
- 15 gWOM and tWOM 11 min · 4 q
Part E PLANTING AND PRODUCTIVE USE
- 16 Plants for a New System 9 min · 4 q
- 17 Growing Food in Botanical Cells 11 min · 4 q
- 18 Companion Planting and Composting 9 min · 4 q
Part F MAINTENANCE
- 19 Maintenance and Handover 10 min · 4 q
Prerequisites
Recommended: Course 8 (Water — Catchment to Tap)
Assessment
Module quizzes: one per lesson, 3–5 multiple choice questions.
Final examination:
| Area | Weight |
|---|---|
| System understanding, regulation and sizing | 25% |
| Plumbing, slope and components | 20% |
| Cell construction — layout to filling | 25% |
| Pumps, power and modules | 20% |
| Planting and maintenance | 10% |
Practical submission (required for Pangea Certified Builder credit): a complete liquid waste design for a real or specified site — interior cell sized to fixture count, exterior cell sized to the local dormant season, plumbing layout with slopes and elevations, component schedule, pump and module specification, establishment planting plan, and the maintenance schedule as it would be handed to a resident.
Integration requirement: the design must reconcile with a Course 8 water design for the same building. Treated greywater volume available for flushing must match the toilet demand assumed in the water calculation. Submitting the two independently is the failure this requirement exists to catch.
About this course
Course competency
On completing this course you can design, build, plumb, commission and maintain interior and exterior botanical cells that treat greywater and blackwater on site, reuse treated greywater to flush toilets, and pass conventional plumbing inspection while doing it.
Why this course exists
Course 8 showed a regenerative building using half the fresh water of a conventional one. Nearly half of that saving — 13.68 of 29 gallons per person per day — came from a single line: the toilet flushes with treated greywater instead of drinking water.
This course is how that line becomes true.
That is the honest framing. The water system and the waste system are one system seen from two ends. Design them separately and the numbers in Course 8 do not hold. And the payoff is larger than flush water: a building that treats its own waste needs no municipal sewer connection and no functioning leach field to be habitable, which is what makes housing possible on land that conventional servicing would price out of reach.
The principle that makes this permittable
This system does not replace conventional plumbing. It is added to it.
Every botanical cell sits inside a loop created by valving. Every loop can be bypassed entirely, sending flow straight to a conventional septic tank and leach field. The drain layout, pipe sizes and slopes are ordinary. The system as outlined meets International Building Code.
That is the sentence to lead with in a permit office. Your plumber sees what they expect to see; any locally licensed plumber can install it and pull the permit. The botanical cells are an addition the building can run without — which is exactly why an inspector can approve them.
How the system works
Sinks, showers, tubs
│
├─[3-way diverter]──────────────► conventional leach field (bypass)
│
▼
INTERIOR BOTANICAL CELL (greywater)
│ rock bulb · plants · roots · bacteria · oxygenation
│ peat moss filter → well at the deep end
│
├─ recirculation pump ──► back to the reception box
│
├─ priming pump ──► gWOM ──► charcoal filter ──► TOILET FLUSH
│
└─ overflow ──► 3" septic line
│
▼
SEPTIC TANK / PRE-TREATMENT CELL
│
├─[3-way diverter]──► conventional leach field (bypass)
▼
EXTERIOR BOTANICAL CELL (blackwater)
│
├─ priming pump ──► tWOM ──► LANDSCAPE IRRIGATION
│
└─ overflow ──► septic line or a further cell
Water is used four times: once at the fixture, again through the interior cell's plants, again in the toilet, and again through the exterior cell's plants before reaching the landscape. After the exterior cell, the water tests below measurable nitrate levels.
Course structure
| Part | Lessons | Subject |
|---|---|---|
| A | 1–3 | The system, the regulations, and sizing |
| B | 4–6 | Plumbing and components |
| C | 7–12 | Building the cell — layout to filling |
| D | 13–15 | Pumps, power and the organizing modules |
| E | 16–18 | Planting and productive use |
| F | 19 | Maintenance and handover |
The public page for this course has the same syllabus without your progress on it - that is the one to send to somebody else.