Course 3 Level 1 Core Practitioner

Structure I - Biotecture & Tire Wall Construction

Lay out a footprint square and correctly oriented, source and sort tires, pound a structural tire wall, build battered retaining walls, form buttresses and a monolithic bond beam, and set openings.

What you will be able to do

  • Lay out and square a building footprint on real ground
  • Pound a structural tire wall to a repeatable standard
  • Form and pour footings, buttresses and a monolithic bond beam
  • Set door and window openings in a tire wall correctly

Syllabus

5 parts · 19 lessons · 104 assessed questions · about 5 hours

Part A MATERIAL, SUPPLY AND LAYOUT 3 lessons
  • 1Why Tires: Material Properties of a Rammed Earth Tire Wall15 min · 5 q
  • 2Tire Sizing, Sourcing and Site Logistics13 min · 5 q
  • 3Building Layout and Orientation22 min · 8 q
Part B BUILDING THE TIRE WALL 5 lessons
  • 4Setting the First Course10 min · 4 q
  • 5Pounding Tires14 min · 5 q
  • 6Special Techniques: Squishy Tires, the Pick Trick, and Concrete Blocks15 min · 5 q
  • 7The Tire Building Code20 min · 6 q
  • 8Retaining Walls and Battered Construction13 min · 5 q
Part C INFILL: CANS, BOTTLES AND PLASTER 4 lessons
  • 9Can Walls15 min · 5 q
  • 10Bottle Walls and Bottle Bricks14 min · 5 q
  • 11Void Packing and Plastering13 min · 5 q
  • 12Sequencing the Infill with the Structure12 min · 5 q
Part D CONCRETE AND STEEL 4 lessons
  • 13Buttresses17 min · 6 q
  • 14Footings13 min · 5 q
  • 15Door and Window Boxes15 min · 6 q
  • 16The Concrete Bond Beam17 min · 6 q
Part E CLOSING THE SHELL 3 lessons
  • 17Bond Beam Wood Plates and the Roof Interface12 min · 5 q
  • 18Vaulted Roofs - An Introduction16 min · 6 q
  • 19Running the Build - Sequence, Inspections and Quality17 min · 7 q
Ref Appendices 4 references
  • A1Mix Reference
  • A2Tire Coursing Schedule
  • A3Inspection and QA Checklist
  • A4Tool and Equipment List

Before you start

Recommended: Course 1 (Site, Climate & Land Assessment), Course 2 (Permits, Codes & Construction Drawings)

About this course

Course competency

On completing this course you can lay out an Biotecture building footprint square and correctly oriented, source and sort tires, pound a structural tire wall to code, build battered retaining walls, fill and plaster can and bottle walls, form and pour buttresses, footings and a monolithic bond beam, set door and window boxes, and hand a finished structural shell to a roof crew - passing every inspection along the way.

Why this course exists

A building that catches its own water, treats its own waste and makes its own power is still only as good as the box it happens in. Courses 8, 9 and 10 describe systems that assume a particular kind of enclosure: massive, tight, bermed, thermally stable, and cheap enough that the money saved goes into the systems rather than the walls.

This is that enclosure.

The tire wall is the single decision that makes the rest of the Pangea model financially possible. A conventional structural wall with equivalent thermal performance costs more per square foot than the entire water and power system combined. The tire wall costs the price of moving dirt.

What you are really learning here is how to convert two things a community already has in surplus - waste tires and unskilled willing labor - into the most expensive component of a house.

The argument, in one paragraph

The automobile tire does not biodegrade. It cannot be safely stockpiled in quantity: buried tire piles trap methane, hold standing water, breed mosquitoes and burn for months when they catch. It is expensive to recycle because separating steel belt from rubber compound is hard. Every city on earth pays to manage this problem. Fill one with rammed earth and you have a 300-pound structural brick, encased in steel and rubber, that a person with no trade skills can make in fifteen minutes with a shovel and a sledgehammer, at a material cost of zero. The property that makes the tire an environmental liability - it will not go away - is exactly the property you want in a bearing wall.

Course structure

Part Lessons Subject
A 1-3 The material, the supply chain, and the layout
B 4-8 Building the tire wall
C 9-12 Infill: cans, bottles, void packing and plaster
D 13-16 Concrete and steel: buttresses, footings, boxes, bond beam
E 17-19 Closing the shell, roof interface, and running the build
- A1-A4 Appendices: mixes, tire schedule, inspections, tools

A note on the name

Pangea calls these Biotecture buildings.

Not Earthships. Earthship is Michael Reynolds' term for the buildings he developed in Taos from the 1970s onward, and it belongs to that body of work. Pangea Biotecture builds in that tradition and has extended it - into community-scale development, affordable housing, 3D-printed construction and this curriculum - and uses its own name for its own buildings.

Where these courses say "Earthship" they mean it historically - Michael Reynolds' work, the Earthship volumes, or Earthship Biotecture the organization. Where they describe what Pangea builds, they say Biotecture building.

Use the same discipline in your own work. It is accurate, it credits the origin properly, and it keeps the two clearly distinct.

Before you start

This course assumes you have a stamped construction drawing set. Every lesson refers to it. Layout sheets, footing locations and elevations, buttress positions, opening schedules and bond beam details are all drawing-set items - this course teaches you to execute a drawing set, not to design without one.

It also assumes Course 2. Tire construction is permittable almost everywhere, but only if you approach the building department correctly. Lesson 7 gives you the code language; Course 2 gives you the conversation.